Export Cable Installation and Burial

Among MOVE’s experience is export cable installation for grid connection of offshore wind farms to the shore or the installation of Interconnectors. With the experience of multiple installations and technologies in the pocket MOVE can provide Clients the full installation and burial concept.

MOVE Charter’s in the most suitable vessels for the job which is very competitive compared to companies that run their own fleet since we do not need to cover for “overheads” or lay-up/idle time for a vessel.

MOVE’s experienced and dedicated personnel can deliver state of the art solutions and carries out the installation engineering in house, inclusive route selection and design, interpretation of the survey data and do carry out GIS Management to prevent misinterpretation in the long run.

Starting from either shore side or OHVS side, MOVE make sure that the expectations of the Client are fully met


Contact us about our Services

Want to know more about our services? You can ask us anything. [recaptcha]

Installation Services

Our Installation Services: